DUNBAR Cement Mill |
Shell repair (new section fitted) |
HOPE, SHEFFIELD Cement Mill. |
Trunnion repair. |
WEARDALE. No.1 Kiln No.2 Kiln No.2 Kiln |
3 x tyre repairs. 2 x tyre repairs. kiln roller repair and re- machine. |
NORTHFLEET. No.4 Washdrum |
trunnion repair. |
RIBBLESDALE. No. 9 mill |
trunnion repair. |
PADESWOOD. No. 4 mill No. 3 Kiln No.1 Kiln |
trunnion repair. major shell repairs. 2 x tyre repairs. |
LIMERICK . No.1 Kiln |
2 tyre cracks repaired. |
EUTECTIC CO. LTD (Dublin Port Tunnel) Herrenknecht 12.875M TBM |
Assemble and weld cutting head on site. |
DROGHEDA. No. 2 Kiln, Girth Gear. No. 2 Kiln. Cement Mill. No. 2 Kiln, No. 2 tyre No. 2 Kiln, No. 2 tyre No. 2 Kiln, No. 2 tyre No. 2 Kiln, No. 2 tyre Raw Mill 2. No. 2 Kiln, Conditioner Tower |
3 cracks repaired. Summer shutdown work on grate cooler and pre-heat tower. Trunnion repair. 7 cracks repaired. 3 cracks repaired. 3 cracks repaired. 5 cracks repaired. Re-make outer casing. Major repairs (255 M cracked) |
ROCHESTER Cement Mill No. 3 Raw Mill |
trunnion repair. 2 x trunnion repairs. |
SOUTHAM. No. 6 mill No. 6 kiln Kiln I.D. fan |
trunnion repair. shell repairs (38 Metres) Re-furbish impellor. |
SOUTH FERRIBY . No.3 Mill No.4 Mill No.2 Kiln No. 1 Kiln |
trunnion repair. 5 x dished end weld repairs. 2 x in-situ roller repairs. Tyre support pads re-weld. |
HERRENKNECHT GERMANY (Channel Tunnel Rail Link) 8.5M tunnel boring machine. |
Assemble and weld on site Kent. |